Showing comments and forms 1 to 7 of 7

Object

Regulation 18 Draft Local Plan

Representation ID: 190

Received: 09/03/2024

Respondent: Mrs Marie Jackson

Representation Summary:

Need to see a comprehensive masterplan before I can make an informed decision.

Object

Regulation 18 Draft Local Plan

Representation ID: 329

Received: 03/04/2024

Respondent: Barrowby Parish Council

Representation Summary:

Section a) The masterplan for this site has been delivered and accepted by ASKDC Board.
Please correct the information and add any necessary details from this Master plan before publishing

Object

Regulation 18 Draft Local Plan

Representation ID: 422

Received: 09/04/2024

Respondent: Barrowby Parish Council

Representation Summary:

Section a) The masterplan for this site has been delivered and accepted by ASKDC Board. Please correct the information and add any necessary details from this Master plan before publishing.

Object

Regulation 18 Draft Local Plan

Representation ID: 1084

Received: 24/04/2024

Respondent: Dr Ray Butler

Representation Summary:

Only acceptable if a true brownfield site, else should not happen

Support

Regulation 18 Draft Local Plan

Representation ID: 2379

Received: 25/04/2024

Respondent: Defence Infrastructure Organisation Safeguarding Team

Representation Summary:

- Development of, or exceeding, 91.4m in height above ground level will trigger statutory consultation requirement.
- Development that might result in the creation of attractant environments for large and flocking bird species hazardous to aviation, including the potential for an environment attractive to hazardous bird species to be formed temporarily

Attachments:

Object

Regulation 18 Draft Local Plan

Representation ID: 2527

Received: 24/04/2024

Respondent: David Wilson Homes East Midlands

Agent: Savills

Representation Summary:

SKPR-272 Barrowby is not considered to be capable of delivering the 270 units as identifed in the table in Policy H1. Part of this site has already been delivered and the rest of the site has planning applications already submitted. Paragraph 12.62 of the draft plan states ‘the allocation at Barrowby will deliver up to 270 new dwellings’ and acknowledges that ‘part of the site has been completed with 49 new homes delivered in 2021/2022 as part of an affordable housing scheme’. As such, part of the site has already been delivered and subsequently it is considered further dwellings will need to be found to replace the allocation.

Attachments:

Object

Regulation 18 Draft Local Plan

Representation ID: 2528

Received: 24/04/2024

Respondent: David Wilson Homes East Midlands

Agent: Savills

Representation Summary:

SKPR-272 Barrowby is not considered to be capable of delivering the 270 units as identifed in the table in Policy H1. Part of this site has already been delivered and the rest of the site has planning applications already submitted. Paragraph 12.62 of the draft plan states ‘the allocation at Barrowby will deliver up to 270 new dwellings’ and acknowledges that ‘part of the site has been completed with 49 new homes delivered in 2021/2022 as part of an affordable housing scheme’. As such, part of the site has already been delivered and subsequently it is considered further dwellings will need to be found to replace the allocation.

Attachments: