Regulation 18 Draft Local Plan

Search representations

Results for National Grid UK search

New search New search

Object

Regulation 18 Draft Local Plan

E1: SKPR 286 (GR-SE1) - Grantham Southern Gateway Strategy Employment Opportunity (118.19 hectares)

Representation ID: 2162

Received: 23/04/2024

Respondent: National Grid UK

Agent: Avison Young

Representation Summary:

Site crosses or in close proximity to NGET assets. Without appropriate acknowledgement of the NGET assets present within the site, these policies should not be considered effective as they cannot be delivered as proposed; unencumbered by the constraints posed by the presence of NGET infrastructure.

Proposes modifications to the above site allocations and/or policies to include wording to the following effect:
Policy E1 – Grantham Southern Gateway Employment Opportunity
“2. The development will be developed with the following site-specific criteria
j. a strategy for responding to the NGET overhead transmission lines present within the site which demonstrates how the NGET Design Guide and Principles have been applied at the masterplanning stage and how the impact of the assets has been reduced through good design.”

Attachments:

Object

Regulation 18 Draft Local Plan

DE1: Promoting Good Quality Design

Representation ID: 2163

Received: 23/04/2024

Respondent: National Grid UK

Agent: Avison Young

Representation Summary:

To ensure that Policy DE1 Promoting Good Quality Design is consistent with national policy we would request the inclusion of a policy strand such as:

“p. take a comprehensive and co-ordinated approach to development including respecting existing site constraints including utilities situated within sites.”

Attachments:

For instructions on how to use the system and make comments, please see our help guide.